Field team
Grey van checks come from the fleet system through eventsUsing(): they are shown, but cannot be moved.
Workshop
Drag a job between the two boards to hand it over to the other team.
Waiting for a technician
Drag a job by its title onto a technician.
| Title | Priority | Length |
|---|---|---|
|
Boiler service Dach-Dooley |
urgent
|
3 h
|
|
Install heat pump Rowe-Kub |
urgent
|
90 min
|
|
Install heat pump Klein-Kling |
urgent
|
1 h
|
|
AC check Aufderhar-Carter |
low
|
1 h
|
|
Fix dishwasher Grant, Deckow and Deckow |
normal
|
2 h
|
|
Rewire kitchen O'Reilly, Thiel and Cole |
low
|
2 h
|
|
Fix dishwasher Wunsch-Stoltenberg |
low
|
3 h
|
|
Install heat pump Ankunding, Moore and Torphy |
normal
|
90 min
|
|
Blocked drain Parker, Sporer and Moore |
normal
|
90 min
|
|
Boiler service Schmidt, Satterfield and Hickle |
low
|
90 min
|
|
Leaking tap White, Kihn and Rice |
low
|
2 h
|
|
Blocked drain Goyette, Veum and Beatty |
normal
|
1 h
|
|
Install heat pump Grant, Leannon and Feil |
low
|
2 h
|
|
Leaking tap Ernser-Lang |
low
|
90 min
|