Try this
- Drag a job to another time or another technician: it moves with a dashed outline, and "Unsaved changes" appears above the timeline.
- Move two or three more jobs. The number next to "Unsaved changes" counts them.
- Press "Undo all": every job goes back where it was. Nothing was saved.
Show 2 more
- Move a job, then drag it back to where it was: it is no longer a draft.
- Move a few jobs again and press "Save all": they are saved together, a message says so, and the dashed outlines go away.
What you see
- A dashed outline and a dot on a job: moved, not saved yet.
- If someone else moved one of your draft jobs in the meantime, "Save all" saves nothing and shows their change instead of overwriting it.
- Leaving the page with drafts asks you first: drafts are kept only on this page.